首页

中英文工程合同

资源预览文档简介为自动调取,内容显示的完整度及准确度或有误差,请您下载后查看完整的文档内容。

1/6

2/6

剩余4页未读,查看更多内容需下载

 <br />Contract of Construction Project <br /> <br />合同编号:  Contract Number: <br />工程名称: Project Name:   <br /> <br />发包方(甲方): 工程设计顾问(北京)                                                                                 <br />Employer (Party A): International Consulting Engineers ( Beijing) Limited   <br /> <br />承包方(乙方): 中寰艺高建筑装饰工程有限公司         <br />Contractor (Party B): Zhong Huanyigao Building Decoration Engineering Co. , Ltd   <br /> <br /> <br />根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。 <br />In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract.   <br /> <br /> <br />第一条 工程项目Article 1, Project item <br />1.  工程地点:  Project site: <br />2. 工程范围:  Scope of project <br />3. 工程造价:人民币     元整  (该造价为包工包料价) <br />Project cost: PMB   Yuan only(Cost of this contract is the contract price for labor and materials)   <br /> <br /> <br />第二条施工准备  Article 2, Preparation for construction <br />1. 甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。 <br />Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .   <br /> <br />2. 乙方:. Party B: <br />① 负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作; <br />Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area.   <br /> <br />② 组织施工管理人员和材料、施工机械进场;   <br />Organize construction management staff and construction materials, construction machinery enter the Site.   <br /> <br />③ 负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处。   <br />Be responsible for keeping public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.   <br /> <br /> <br />第三条工程期限 Article 3  Period of Construction <br />1. 根据工期和使用需要,商定工程总施工期为    天(日历天),自   年   月    日开工至   年   月    日完工 <br />According to the period of construction and the use need,  the total construction period agreed shall be         days (Calendar days), start from the date of     and complete on the date of    .   <br /> <br />2. 如遇下列情况,经甲方现场代表签证后,工期相应顺延: <br />Construction period shall be prolonged upon Party A site representative&#039;s confirmation when the matters occur as follows.   <br />① 按施工准备规定,甲方未协助乙方办理临时水电及垂直运输,影响进场施工; <br />According to the requirements of construction preparation, Party A fail tot assist Party B to apply for temporary wate...

版权提示

  • 温馨提示:
  • 1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
  • 2. 本文档由用户上传,版权归属用户,莲山负责整理代发布。如果您对本文档版权有争议请及时联系客服。
  • 3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
  • 4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服vx:lianshan857处理。客服热线:13123380146(工作日9:00-18:00)

文档下载

发布时间:2023-01-16 14:40:50 页数:6
价格:¥3 大小:44.50 KB
文章作者:U-35447

推荐特供

MORE